Nouvelles du chantier
Construction de la nouvelle Ecole européenne Luxembourg II
No. 2 – Octobre 2011
Photos taken on September, 9th
The compounds as well as several indoor design have quickly taken form.
The stony ways of the construction site have been transformed into rolled alleys.
Some basic elements have already been realized as you can see on the photos below.

Bus-Stop with « kiss&go »-zone Parking near the primary building

The gym with its wooden design Flagging of the swimming pool

Outdoor stairs relating the different Composition with planting in the inner
terraces and buildings court yard in the secondary building
During the month of October, it will be possible here to present the mobility concept.


