
Nouvelles du chantier
Construction de la nouvelle Ecole européenne Luxembourg II
No. 1 – Septembre 2011
The construction works follow the foreseen timetable. In the buildings all walls have been placed and the inside perfecting has started.
The different buildings are connected through ramps who also allow wheelchairs and other vehicles to pass if necessary.
The example rooms reflect a warm and luminous atmosphere. Wood is an often repeated element in the new school and it can be seen at several places where its advantages are used, for acoustic functions for example.
Colored windows give a friendly touch to the huge buildings and at the same time another look on the world! (On the picture: staircase of the nursery building)

The outer space works have already begun.


